In this case study, we explore the collaboration between HFiltration and a Swiss company specializing in railway maintenance. In anticipation of a new project planned for 2025, the company requested an upgrade of the filtration system, which includes the installation of 8 pairs of filters specifically designed to fit the new trains. This project focuses on optimizing airflow, maximizing suction, and cooling the grinding wheel placed under the train.
HFiltration initiated a detailed measurement on existing filter units. It was then decided to offer a new unit based on the PC12 model, optimized for enhanced airflow and sustained performance over time. The unit includes two motorfans of 11 kW each, an upgraded tank, and an air distribution system that improve cleaning and filter life.